| Scale & Gauge: |
HO |
| Theme: |
A free-lanced, alternate route for Southern Pacific mainline traffic connecting Roseville and the western Nevada areas and serving a variety of industries and a military supply depot |
| Locale: |
Sierra Nevada foothills and mountains in California |
| Era: |
1995 (at time of merger with Union Pacific) |
| Size: |
15' x 23' |
Layout Style & Features: |
Walk around operations
Loop-to-wye configuration with staging
Switching and branch lines
|
| Benchwork: |
L-girder |
| Layout Heights: |
48" to 58" for trackwork
39" to 72" for scenery |
| Trackwork: |
Code 83 track. Minimum Radii: 30" mainline, 26" branchlines & spurs.
Turnouts: No. 5 minimum. Maximum Grades: 2% mainline, 3% branchlines |
| Scenery: |
Mostly hard shell with cast rock |
| Lighting: |
Full-spectrum fluorescent
Blue rope light (for night operations) |
| Control: |
North Coast Engineering DCC |
| Completion State: |
Benchwork: 100%
Trackwork: 75%
Rough Scenery: 75% (including various mock-ups)
Finished scenery: 10% |
Other Information & Comments: |
Backdrop is largely populated with clouds
A number of finished structures with “placeholder” structures in other locations |
| Access Considerations: |
No wheel chair access. Stairway to room entrance.
Drop-down bridge across entrance. Aisles are 3-feet wide |